A Block, Hanghai Square, Erqi District, Zhengzhou City, Henan, China | ada.wu@mfbuildingmaterials.com |
English
|
Place of Origin: | China |
Brand Name: | MF |
Certification: | ISO |
Model Number: | M38 |
Minimum Order Quantity: | 500 pcs |
---|---|
Price: | ~ |
Packaging Details: | / |
Delivery Time: | 20~30days |
Payment Terms: | L/C,D/A,D/P,T/T,Western Union,MoneyGram |
Supply Ability: | 50000pcs/mouth |
Name: | Base Jack | Material: | Q235 Or 20# Steel |
---|---|---|---|
Diameter: | 38mm | Type: | Solid, Hollow |
Finish: | Painted , Powder , Galvanized , HDG Or Customized | Application: | Scaffolding System |
Material: | Q235/Q245 | Color: | Sliver/Customized |
Color: | Sliver/Customized | Usage: | Construction |
Type: | Heavy Duty | Color: | Silver/Customized |
Highlight: | scaffold base plate,u head jack |
Hot Dip Galvanized Scaffold Screw Jack , U Head Jack Base OEM Service
Scaffolding screw jack base is made of screw tube and sheet metal plate,and assembled with casted nut.The application is support scaffolding system and also formwork system,adjusting the construction system height flexibly.
Specification of Hot Dip Galvanized Scaffold Screw Jack , U Head Jack Base OEM Service:
Item | Jack Base |
Material | Q235 |
Surface treatment | Painted/Galvanized/HDG |
Color | Red, silver and as you requirement |
Size | OEM service, customer’s size is also available |
Certification | ISO9001 |
Advantages | Top quality; Easy installation; Competitive price; Standard package;Timely delivery |
MOQ | 100 PCS |
Delivery time | 10-25 days |
Payment | T/T L/C and as your request |
Package | Pallet, safe,standard package and customized |
Photo of Hot Dip Galvanized Scaffold Screw Jack , U Head Jack Base OEM Service:
FAQ of Hot Dip Galvanized Scaffold Screw Jack , U Head Jack Base OEM Service:
1. Q: What's your MOQ of scaffold screw jack base?
A: 200pcs.
2. Q: What's your packing methods?
A: Packed into bundle, and rest in bulk.
3. Q: What's your payment terms?
.A: T/T 30% in advance & T/T 70% before shipment.
4. Q: What's your delivery time?
A: 10-20 days after received the advance payment.
5. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.
8. Q: Do you supply other construction and scaffolding materials?
A: Yes. All related construction materials.
(1) formwork accessories(nut, tie bar, plastic pipe, cone, water stopper etc)
(2) scaffolding pipes BS1139
(3) scaffolding frame BS1139
(4) steel coupler /clamp(preesed / drop forged coupler)
(5) plastic building materials(rebar cap, dowel sleeves, wheel spacer, chair spacer, ABS ribbed formwork etc)
(6) PVC formwork board
(7) screw adjustable base jack
(8) adjustable scaffolding props and accessories
Contact Person: Mrs. Ada Wu
Tel: +86 17719809965
Fax: +86-371-66632600
PP Rebar Safety Caps , Mushroom Rebar Cap Protect Workers Three Size
Building Customized Product Plastic Safety Rebar End Cap ISO9001 Certification
Steel Reinforced Rebar Safety Caps Fits #3 - #8 Rebar 3.5mm Thickness
Thread Rolling Shore Props Sleeve Carbon Steel Q235 With High Strength OEM
Scaffolding Accessories Shore Prop Thread Rolling DIN EN 1065 Standard OEM
800mm Width Construction Formwork Accessories ABS PP PV Formwork Board
Light Weight Square Column Formwork ABS Beam Formwork 300 * 300mm Size