Send Message
A Block, Hanghai Square, Erqi District, Zhengzhou City, Henan, China
Home ProductsConstruction Formwork Accessories

Tie Nut Construction Formwork Accessories Take 140 Up To 150 Blows Before Break

Tie Nut Construction Formwork Accessories Take 140 Up To 150 Blows Before Break

  • Tie Nut Construction Formwork Accessories Take 140 Up To 150 Blows Before Break
  • Tie Nut Construction Formwork Accessories Take 140 Up To 150 Blows Before Break
  • Tie Nut Construction Formwork Accessories Take 140 Up To 150 Blows Before Break
  • Tie Nut Construction Formwork Accessories Take 140 Up To 150 Blows Before Break
  • Tie Nut Construction Formwork Accessories Take 140 Up To 150 Blows Before Break
Tie Nut Construction Formwork Accessories Take 140 Up To 150 Blows Before Break
Product Details:
Place of Origin: China
Brand Name: MF
Certification: ISO9001
Model Number: Swivel flange nut
Payment & Shipping Terms:
Minimum Order Quantity: 500pcs
Price: $0.60-0.70/pcs
Packaging Details: 50pcs/woven bag, 100bags/ton bag
Delivery Time: 10-25days
Payment Terms: T/T, D/A, L/C, D/P, Western Union, MoneyGram
Supply Ability: 20000pcs/month
Contact Now
Detailed Product Description
Name: Swivel Wing Nut Material: Ductile Casted Iron QT450-10
Weight: 1kg/unit Tensile Strength: 200kN
OEM: Nut With OEM Logo Feature: Heat Treatment Nut, 150times Hammer Blows
High Light:

Tie Nut Construction Formwork Accessories

,

150 Blows formwork wing nut

,

140 Blows formwork wing nut

Formwork Tie Nut Take 140 Up To 150 Blows Before Break:

 

The nut and plate is being turned on a tie bar, to clamp formwork plates. The formwork plates make a mould to poor a concrete element.
After the concrete has hardened, the formwork plates have to be removed by losening the nut. While the nut is very firm, they use hammer blows to loosen. After 2 or 3 blows the nut is loose and can be turned of.

To test quality, customer counts the amounts of hammer blows before the nut breaks. Our cast iron wing nut with heat treatment can take 140, up to 150 blows before break.

 

 

 

Specification of Formwork Tie Nut Take 140 Up To 150 Blows Before Break:

 

Tie nut types Formwork wing nut Formwork Ancher tie nut Swivel formwork tie nut
Weight 0.175/0.25/0.3/0.61kg 0.16/0.36/0.5/0.6/0.65/1kg 1.25/1.3kg
Pull strength 140-150KN 170-180KN 170-180KN
Photo Tie Nut Construction Formwork Accessories Take 140 Up To 150 Blows Before Break 0 Tie Nut Construction Formwork Accessories Take 140 Up To 150 Blows Before Break 1 Tie Nut Construction Formwork Accessories Take 140 Up To 150 Blows Before Break 2
Process Casted
Surface treatment Natural, Electric Galvanized ,Hot Dip Galvanized
Heat treatment For enhance nut's hardness, tensile strength, etc
Match tie rod 12/17/20MM or customized size
Material Ductile casted iron QT450-10
Color Self-color (black), silver galvanized or golden galvanized

 

 

Advantages of Formwork Tie Nut Take 140 Up To 150 Blows Before Break:

 

OEM service

* products, logos, package, all could be customized as request.

 

First-Hand price

* Manufacturer with trade ability* Professional foreign trade business and service team* OEM available

 

High Quality

 

* Can take 140, up to 150 blows before break.
* Heat treatment and nice galvanized surface.
 
Stable Supply
* Two casting & one welding factories to sure stable supply.
* All factories have Government-approved environmental qualifications
 

 

What else we supply:

We also supply formwork accessoris, tie nut, tie rod, plastic sleeve, cone, formwork plate, water stopper, scaffold props, scaffold frame, scaffold coupler, jack base, plastic rebar caps, plastic roman pillar, plastic safety fence, OEM service. Please feel free to contact us for one stop shopping of construction products from China, best price and service will be offered!!!

Tie Nut Construction Formwork Accessories Take 140 Up To 150 Blows Before Break 3Tie Nut Construction Formwork Accessories Take 140 Up To 150 Blows Before Break 4Tie Nut Construction Formwork Accessories Take 140 Up To 150 Blows Before Break 5Tie Nut Construction Formwork Accessories Take 140 Up To 150 Blows Before Break 6Tie Nut Construction Formwork Accessories Take 140 Up To 150 Blows Before Break 7Tie Nut Construction Formwork Accessories Take 140 Up To 150 Blows Before Break 8

 

Contact Details
Zhengzhou Duorui enterprise Co., Ltd

Contact Person: Mr. Xu

Tel: +86-17603856227

Fax: +86-371-66632600

Send your inquiry directly to us (0 / 3000)

Other Products